Renewable sites › Greenhill Anaerobic Digestion Plant
Greenhill Anaerobic Digestion Plant
Greenhill Anaerobic Digestion Plant is an operational 1 MW anaerobic digestion plant in Isle of Wight, generating since 10 October 2016. Planning permission was granted on 2 May 2013, 7 months after submission. Operator of record: Black Dog Biogas.
Planning and build timeline
| Application submitted | 17 September 2012 |
| Permission granted | 2 May 2013 7 months after submission |
| Operational | 10 October 2016 41 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Isle of Wight: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Greenhill Anaerobic Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3.2 | 1.7 km |
Solar Photovoltaics · Operational | 6 | 2.3 km |
Advanced Conversion Technologies · Under Construction | 3.3 | 3.7 km |
Solar Photovoltaics · Operational | 4.5 | 5.6 km |
Anaerobic Digestion · Operational | 2.2 | 5.8 km |
Solar Photovoltaics · Operational | 10.6 | 5.9 km |
Landfill Gas · Operational | 1.5 | 6 km |
Solar Photovoltaics · Operational | 1.5 | 9.7 km |
How big is Greenhill Anaerobic Digestion Plant?
Greenhill Anaerobic Digestion Plant has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Greenhill Anaerobic Digestion Plant?
REPD records the operator as Black Dog Biogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Greenhill Anaerobic Digestion Plant approved and built?
The application was submitted on 17 September 2012. Permission was granted on 2 May 2013, 7 months later. The site became operational on 10 October 2016, 41 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6638.