Novarly ParcelRenewable sites

Renewable sitesFieldscale

Fieldscale

Fieldscale is operational in Isle of Wight with a recorded capacity of 10.6 MW, and has been generating since 2016-04-15.

10.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-04-15
Solar Photovoltaics
Technology
SBC Renewables
Isle of Wight
Authority
England

Planning and build timeline

Application submitted2014-08-07
Permission granted2014-10-22
2 months after submission
Operational2016-04-15
18 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Isle of Wight’s record on solar

Isle of Wight has decided 16 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Isle of Wight

Other built sites within 15 km

SiteMWDistance
Gore Cross - AD
Anaerobic Digestion · Operational
2.20.5 km
Grange Farm
Solar Photovoltaics · Operational
64.1 km
VENTNOR ROAD SOLAR PARK
Solar Photovoltaics · Operational
4.84.9 km
Greenhill Anaerobic Digestion Plant
Anaerobic Digestion · Operational
15.9 km
Isle of Wight Waste Recovery Park
Advanced Conversion Technologies · Under Construction
3.37 km
Chawton Farm Solar Farm
Solar Photovoltaics · Operational
3.27.6 km
Standen Heath
Landfill Gas · Operational
1.58.2 km
Hill Farm Solar Park
Solar Photovoltaics · Operational
10.28.3 km

How big is Fieldscale?

Fieldscale has a recorded installed capacity of 10.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fieldscale?

REPD records the operator as SBC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fieldscale approved and built?

The application was submitted on 2014-08-07. Permission was granted on 2014-10-22, 2 months later. The site became operational on 2016-04-15, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4833.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council