Renewable sitesGore Cross - AD

Gore Cross - AD

Gore Cross - AD is operational in Isle of Wight with a recorded capacity of 2.2 MW, and has been generating since 2014-12-20.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-20
Anaerobic Digestion
Technology
Wight Farm Energy
Isle of Wight
Authority
England

Planning and build timeline

Application submitted2013-07-05
Permission granted2013-12-20
6 months after submission
Operational2014-12-20
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Fieldscale
Solar Photovoltaics · Operational
10.60.5 km
Grange Farm
Solar Photovoltaics · Operational
64.2 km
VENTNOR ROAD SOLAR PARK
Solar Photovoltaics · Operational
4.85.1 km
Greenhill Anaerobic Digestion Plant
Anaerobic Digestion · Operational
15.8 km
Isle of Wight Waste Recovery Park
Advanced Conversion Technologies · Under Construction
3.36.6 km
Chawton Farm Solar Farm
Solar Photovoltaics · Operational
3.27.5 km
Standen Heath
Landfill Gas · Operational
1.57.8 km
Hill Farm Solar Park
Solar Photovoltaics · Operational
10.28.8 km

How big is Gore Cross - AD?

Gore Cross - AD has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gore Cross - AD?

REPD records the operator as Wight Farm Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gore Cross - AD approved and built?

The application was submitted on 2013-07-05. Permission was granted on 2013-12-20, 6 months later. The site became operational on 2014-12-20, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 327.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council