Novarly ParcelRenewable sites

Renewable sitesIsle of Wight Waste Recovery Park

Isle of Wight Waste Recovery Park

Isle of Wight Waste Recovery Park is under construction in Isle of Wight with a recorded capacity of 3.3 MW.

3.3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
AmeyCespa
Isle of Wight
Authority
England

Planning and build timeline

Application submitted2015-11-20
Permission granted2016-04-22
5 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Standen Heath
Landfill Gas · Operational
1.52.3 km
Durrants Farm Solar
Solar Photovoltaics · Operational
4.52.4 km
Greenhill Anaerobic Digestion Plant
Anaerobic Digestion · Operational
13.7 km
Chawton Farm Solar Farm
Solar Photovoltaics · Operational
3.24 km
Grange Farm
Solar Photovoltaics · Operational
65.3 km
Stables Farm
Solar Photovoltaics · Operational
1.56.3 km
Gore Cross - AD
Anaerobic Digestion · Operational
2.26.6 km
Fieldscale
Solar Photovoltaics · Operational
10.67 km

How big is Isle of Wight Waste Recovery Park?

Isle of Wight Waste Recovery Park has a recorded installed capacity of 3.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Isle of Wight Waste Recovery Park?

REPD records the operator as AmeyCespa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Isle of Wight Waste Recovery Park approved and built?

The application was submitted on 2015-11-20. Permission was granted on 2016-04-22, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5971.