Uskmouth Power Station, West Nash Road - Battery Storage Facility

Uskmouth Power Station, West Nash Road - Battery Storage Facility is under construction in Newport with a recorded capacity of 120 MW.

120 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
AW1 Energy Storage Limited
Newport
Authority
Wales

Planning and build timeline

Application submitted2023-10-25
Permission granted2024-01-11
3 months after submission
Operationalnot recorded

Newport’s record on battery storage

Newport has decided 6 battery storage schemes and approved 100%, taking a median of 3 months. See every battery storage scheme decision in Newport

Other built sites within 15 km

SiteMWDistance
Nash Waste Water Treatment Works Turbine
Wind Onshore · Operational
2.50.7 km
Uskmouth Power Station
Biomass (co-firing) · Operational
180.9 km
Uskmouth Power Station - Battery Storage
Battery · Under Construction
2300.9 km
ANP Newport Wind Turbine
Wind Onshore · Operational
2.31.5 km
Liberty Steel Power Station
Biomass (dedicated) · Operational
91.8 km
Llanwern Solar Farm & Battery Storage
Battery · Operational
2.3 km
Solutia UK Ltd
Wind Onshore · Operational
52.4 km
Traston Road
Battery · Operational
202.6 km

How big is Uskmouth Power Station, West Nash Road - Battery Storage Facility?

Uskmouth Power Station, West Nash Road - Battery Storage Facility has a recorded installed capacity of 120 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Uskmouth Power Station, West Nash Road - Battery Storage Facility?

REPD records the operator as AW1 Energy Storage Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Uskmouth Power Station, West Nash Road - Battery Storage Facility approved and built?

The application was submitted on 2023-10-25. Permission was granted on 2024-01-11, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15263.