Novarly ParcelRenewable sites

Renewable sitesUskmouth Power Station

Uskmouth Power Station

Uskmouth Power Station is an operational 18 MW biomass co-firing plant in Newport, generating since 1 March 2015. REPD does not record the planning grant date. Operator of record: SIMEC Group.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2015
Biomass (co-firing)
Technology
SIMEC Group
Newport
Authority
Wales

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 March 2015

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Newport: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Uskmouth Power Station’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
2300 km
Wind Onshore · Operational
2.50.7 km
Battery · Under Construction
1200.9 km
Battery · Operational
1.5 km
Biomass (dedicated) · Operational
91.7 km
Wind Onshore · Operational
2.31.9 km
Wind Onshore · Operational
52.2 km
Battery · Operational
202.5 km

How big is Uskmouth Power Station?

Uskmouth Power Station has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Uskmouth Power Station?

REPD records the operator as SIMEC Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Uskmouth Power Station approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 March 2015.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6089.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode