Traston Road

Traston Road is an operational 20 MW battery storage site in Newport, generating since 14 January 2026. Planning permission was granted on 3 November 2016, 2 months after submission. Operator of record: Field Energy.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 14 January 2026
Battery
Technology
Field Energy
Newport
Authority
Wales

Planning and build timeline

Application submitted19 August 2016
Permission granted3 November 2016
2 months after submission
Operational14 January 2026
110 months after consent

Screening a site of your own?

RedlineUK · £39

Newport approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Traston Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Newport’s record on battery storage

Newport has decided 6 battery storage schemes and approved 100%, taking a median of 3 months. See every battery storage scheme decision in Newport

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
50.3 km
Biomass (dedicated) · Operational
90.8 km
Solar Photovoltaics · Operational
0.9 km
Wind Onshore · Operational
2.31.4 km
Wind Onshore · Operational
2.52 km
Battery · Operational
2.4 km
Biomass (co-firing) · Operational
182.5 km
Battery · Under Construction
2302.5 km

How big is Traston Road?

Traston Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Traston Road?

REPD records the operator as Field Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Traston Road approved and built?

The application was submitted on 19 August 2016. Permission was granted on 3 November 2016, 2 months later. The site became operational on 14 January 2026, 110 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6929.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode