ANP Newport Wind Turbine

ANP Newport Wind Turbine is operational in Newport with a recorded capacity of 2.3 MW, and has been generating since 2016-08-15.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-08-15
Wind Onshore
Technology
Associated British Ports
Newport
Authority
Wales

Planning and build timeline

Application submitted2015-07-24
Permission granted2015-09-30
2 months after submission
Operational2016-08-15
11 months after consent

Other built sites within 15 km

SiteMWDistance
Liberty Steel Power Station
Biomass (dedicated) · Operational
91 km
Nash Waste Water Treatment Works Turbine
Wind Onshore · Operational
2.51.2 km
Solutia UK Ltd
Wind Onshore · Operational
51.4 km
Traston Road
Battery · Operational
201.4 km
Uskmouth Power Station, West Nash Road - Battery Storage Facility
Battery · Under Construction
1201.5 km
Uskmouth Power Station - Battery Storage
Battery · Under Construction
2301.9 km
Uskmouth Power Station
Biomass (co-firing) · Operational
181.9 km
Docksway Landfill Scheme
Landfill Gas · Operational
22.2 km

How big is ANP Newport Wind Turbine?

ANP Newport Wind Turbine has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates ANP Newport Wind Turbine?

REPD records the operator as Associated British Ports. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was ANP Newport Wind Turbine approved and built?

The application was submitted on 2015-07-24. Permission was granted on 2015-09-30, 2 months later. The site became operational on 2016-08-15, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5555.