ANP Newport Wind Turbine is an operational 2.3 MW onshore wind farm in Newport, generating since 15 August 2016. Planning permission was granted on 30 September 2015, 2 months after submission. Operator of record: Associated British Ports.
Planning and build timeline
| Application submitted | 24 July 2015 |
| Permission granted | 30 September 2015 2 months after submission |
| Operational | 15 August 2016 11 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Newport: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with ANP Newport Wind Turbine’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 9 | 1 km |
Wind Onshore · Operational | 2.5 | 1.2 km |
Wind Onshore · Operational | 5 | 1.4 km |
Battery · Operational | 20 | 1.4 km |
Battery · Under Construction | 120 | 1.5 km |
Battery · Under Construction | 230 | 1.9 km |
Biomass (co-firing) · Operational | 18 | 1.9 km |
Landfill Gas · Operational | 2 | 2.2 km |
How big is ANP Newport Wind Turbine?
ANP Newport Wind Turbine has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates ANP Newport Wind Turbine?
REPD records the operator as Associated British Ports. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was ANP Newport Wind Turbine approved and built?
The application was submitted on 24 July 2015. Permission was granted on 30 September 2015, 2 months later. The site became operational on 15 August 2016, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5555.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode