Novarly ParcelRenewable sites

Renewable sitesFoxhall Landfill Site

Foxhall Landfill Site

Foxhall Landfill Site is an operational 1.2 MW landfill gas site in East Suffolk, generating since 18 June 1996. Planning permission was granted on 17 October 1994, 2 months after submission. Operator of record: Renewable Power Generation Ltd.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 18 June 1996
Landfill Gas
Technology
Renewable Power Generation Ltd
East Suffolk
Authority
England

Planning and build timeline

Application submitted5 August 1994
Permission granted17 October 1994
2 months after submission
Operational18 June 1996
20 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Suffolk: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Foxhall Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
81.4 km
Biomass (dedicated) · Operational
2.64.6 km
Solar Photovoltaics · Operational
11.64.8 km
Battery · Operational
6.8 km
Solar Photovoltaics · Under Construction
1.59.9 km
Solar Photovoltaics · Operational
1.112 km
Battery · Under Construction
10012 km
EfW Incineration · Operational
2012.9 km

How big is Foxhall Landfill Site?

Foxhall Landfill Site has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Foxhall Landfill Site?

REPD records the operator as Renewable Power Generation Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Foxhall Landfill Site approved and built?

The application was submitted on 5 August 1994. Permission was granted on 17 October 1994, 2 months later. The site became operational on 18 June 1996, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 526.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode