Renewable sitesOvenden Moor (Repower)

Ovenden Moor (Repower)

Ovenden Moor (Repower) is operational in Calderdale with a recorded capacity of 18 MW, and has been generating since 2017-01-24.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-01-24
Wind Onshore
Technology
Yorkshire Windpower
Calderdale
Authority
England

Planning and build timeline

Application submitted2012-08-02
Permission granted2012-11-16
3 months after submission
Operational2017-01-24
50 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Holmfield - Battery Energy Storage
Battery · Under Construction
0.255 km
Bradford West Substation (Harrop Edge Farm)
Battery · Under Construction
49.95.8 km
Trafalgar House Police Station - Installation Of Solar PV System
Solar Photovoltaics · Under Construction
12 km
Morrisons, Bradford Road, Idle - Solar PV Panels
Solar Photovoltaics · Operational
0.814.2 km
Coal Clough Wind Farm
Wind Onshore · Operational
9.614.7 km
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
1614.7 km

How big is Ovenden Moor (Repower)?

Ovenden Moor (Repower) has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ovenden Moor (Repower)?

REPD records the operator as Yorkshire Windpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ovenden Moor (Repower) approved and built?

The application was submitted on 2012-08-02. Permission was granted on 2012-11-16, 3 months later. The site became operational on 2017-01-24, 50 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4408.