Planning and build timeline
| Application submitted | 2012-08-02 |
| Permission granted | 2012-11-16 3 months after submission |
| Operational | 2017-01-24 50 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
- Green Belt — Calderdale
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Holmfield - Battery Energy Storage Battery · Under Construction | 0.25 | 5 km |
Bradford West Substation (Harrop Edge Farm) Battery · Under Construction | 49.9 | 5.8 km |
Trafalgar House Police Station - Installation Of Solar PV System Solar Photovoltaics · Under Construction | — | 12 km |
Morrisons, Bradford Road, Idle - Solar PV Panels Solar Photovoltaics · Operational | 0.8 | 14.2 km |
Coal Clough Wind Farm Wind Onshore · Operational | 9.6 | 14.7 km |
Coal Clough Wind Farm Repowering Wind Onshore · Operational | 16 | 14.7 km |
How big is Ovenden Moor (Repower)?
Ovenden Moor (Repower) has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ovenden Moor (Repower)?
REPD records the operator as Yorkshire Windpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ovenden Moor (Repower) approved and built?
The application was submitted on 2012-08-02. Permission was granted on 2012-11-16, 3 months later. The site became operational on 2017-01-24, 50 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4408.