Novarly ParcelRenewable sites

Renewable sitesMorrisons, Bradford Road, Idle - Solar PV Panels

Morrisons, Bradford Road, Idle - Solar PV Panels

Morrisons, Bradford Road, Idle - Solar PV Panels is an operational 0.8 MW solar farm in Bradford, generating since 1 April 2022. Planning permission was granted on 13 May 2022, 4 months after submission. Operator of record: WM Morrisons Supermarkets Plc.

0.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2022
Solar Photovoltaics
Technology
WM Morrisons Supermarkets Plc
Bradford
Authority
England

Planning and build timeline

Application submitted12 January 2022
Permission granted13 May 2022
4 months after submission
Operational1 April 2022

Screening a site of your own?

RedlineUK · £39

Bradford approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Morrisons, Bradford Road, Idle - Solar PV Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bradford’s record on solar

Bradford has decided 26 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Bradford

Other built sites within 15 km

SiteMWDistance
Sewage Sludge Digestion · Operational
32.7 km
Solar Photovoltaics · Under Construction
4.3 km
Battery · Under Construction
49.98.7 km
Battery · Under Construction
0.2511.5 km
Biomass (dedicated) · Operational
212.5 km
Solar Photovoltaics · Operational
0.2213.3 km
Solar Photovoltaics · Operational
0.213.7 km
Wind Onshore · Operational
1814.2 km

How big is Morrisons, Bradford Road, Idle - Solar PV Panels?

Morrisons, Bradford Road, Idle - Solar PV Panels has a recorded installed capacity of 0.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Morrisons, Bradford Road, Idle - Solar PV Panels?

REPD records the operator as WM Morrisons Supermarkets Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Morrisons, Bradford Road, Idle - Solar PV Panels approved and built?

The application was submitted on 12 January 2022. Permission was granted on 13 May 2022, 4 months later. The site became operational on 1 April 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10443.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode