Novarly ParcelRenewable sites

Renewable sitesTollgate Farm

Tollgate Farm

Tollgate Farm is operational in Warwick with a recorded capacity of 4.3 MW, and has been generating since 2016-03-16.

4.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-16
Solar Photovoltaics
Technology
CRE8 Energy (UK)
Warwick
Authority
England

Planning and build timeline

Application submitted2014-08-20
Permission granted2015-01-12
5 months after submission
Operational2016-03-16
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Warwick’s record on solar

Warwick has decided 18 solar farms and approved 83%, taking a median of 1.8 months. See every solar farm decision in Warwick

Other built sites within 15 km

SiteMWDistance
Brickyard Barn
Solar Photovoltaics · Operational
4.11.9 km
Newbold Pacey Solar Farm�
Solar Photovoltaics · Operational
28.73.1 km
Wolseley National Distribution Centre
Solar Photovoltaics · Operational
24.4 km
Land On The East Side Of Fosse Way
Solar Photovoltaics · Operational
104.8 km
Banbury Road, Gaydon - Solar Array
Solar Photovoltaics · Operational
186 km
Ufton
Landfill Gas · Operational
17 km
The Elms
Solar Photovoltaics · Operational
10.47.1 km
Eastfields Farm, Harbury - Battery Storage
Battery · Under Construction
7.9 km

How big is Tollgate Farm?

Tollgate Farm has a recorded installed capacity of 4.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tollgate Farm?

REPD records the operator as CRE8 Energy (UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tollgate Farm approved and built?

The application was submitted on 2014-08-20. Permission was granted on 2015-01-12, 5 months later. The site became operational on 2016-03-16, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2232.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council