Novarly ParcelRenewable sites

Renewable sitesWolseley National Distribution Centre

Wolseley National Distribution Centre

Wolseley National Distribution Centre is operational in Warwick with a recorded capacity of 2 MW, and has been generating since 2014-03-18.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-18
Solar Photovoltaics
Technology
Wolseley UK
Warwick
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2014-03-18

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Warwick’s record on solar

Warwick has decided 18 solar farms and approved 83%, taking a median of 1.8 months. See every solar farm decision in Warwick

Other built sites within 15 km

SiteMWDistance
Brickyard Barn
Solar Photovoltaics · Operational
4.12.9 km
Land On The East Side Of Fosse Way
Solar Photovoltaics · Operational
104.4 km
Tollgate Farm
Solar Photovoltaics · Operational
4.34.4 km
Ufton
Landfill Gas · Operational
16.9 km
Newbold Pacey Solar Farm�
Solar Photovoltaics · Operational
28.77.2 km
Lower Farm
Solar Photovoltaics · Under Construction
0.58.2 km
Eastfields Farm, Harbury - Battery Storage
Battery · Under Construction
8.2 km
Eastfields Farm, Deppers Bridge - Solar Farm
Solar Photovoltaics · Under Construction
34.88.5 km

How big is Wolseley National Distribution Centre?

Wolseley National Distribution Centre has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wolseley National Distribution Centre?

REPD records the operator as Wolseley UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wolseley National Distribution Centre approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-03-18.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2389.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council