The Elms

The Elms is operational in Stratford-on-Avon with a recorded capacity of 10.4 MW, and has been generating since 2015-03-31.

10.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Foresight Solar Fund
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted2014-09-03
Permission granted2014-11-27
3 months after submission
Operational2015-03-31
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on solar

Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Feldon Vale Solar Farm
Solar Photovoltaics · Operational
49.92.1 km
Weddington Farm
Solar Photovoltaics · Operational
2.12.6 km
Eastfields Farm, Deppers Bridge - Solar Farm
Solar Photovoltaics · Under Construction
34.82.8 km
Eastfields Farm, Harbury - Battery Storage
Battery · Under Construction
3 km
Banbury Road, Gaydon - Solar Array
Solar Photovoltaics · Operational
183.4 km
Ufton
Landfill Gas · Operational
13.7 km
Solar Farm at Fields Farm (Phase 1)
Solar Photovoltaics · Operational
54.2 km
Lower Farm
Solar Photovoltaics · Under Construction
0.54.6 km

How big is The Elms?

The Elms has a recorded installed capacity of 10.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates The Elms?

REPD records the operator as Foresight Solar Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was The Elms approved and built?

The application was submitted on 2014-09-03. Permission was granted on 2014-11-27, 3 months later. The site became operational on 2015-03-31, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2279.