Renewable sitesUfton

Ufton

Ufton is an operational 1 MW landfill gas site in Stratford-on-Avon, generating since 26 November 1999. Planning permission was granted on 6 September 1999, 5 months after submission. Operator of record: Biffa.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 26 November 1999
Landfill Gas
Technology
Biffa
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted14 April 1999
Permission granted6 September 1999
5 months after submission
Operational26 November 1999
3 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Stratford-on-Avon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ufton’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
1.3 km
Solar Photovoltaics · Under Construction
0.51.7 km
Solar Photovoltaics · Under Construction
34.81.7 km
Solar Photovoltaics · Operational
52.3 km
Solar Photovoltaics · Operational
102.6 km
Solar Photovoltaics · Operational
10.43.7 km
Solar Photovoltaics · Operational
2.14.1 km
Solar Photovoltaics · Operational
49.95.7 km

How big is Ufton?

Ufton has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ufton?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ufton approved and built?

The application was submitted on 14 April 1999. Permission was granted on 6 September 1999, 5 months later. The site became operational on 26 November 1999, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 717.