Eastfields Farm, Harbury - Battery Storage

Eastfields Farm, Harbury - Battery Storage is a battery storage site under construction in Stratford-on-Avon. Planning permission was granted on 21 October 2021, 3 months after submission. Operator of record: Vantage RE.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Vantage RE
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted29 July 2021
Permission granted21 October 2021
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Stratford-on-Avon approves 88% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eastfields Farm, Harbury - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on battery storage

Stratford-on-Avon has decided 8 battery storage schemes and approved 88%, taking a median of 5.3 months. See every battery storage scheme decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
34.80.4 km
Landfill Gas · Operational
11.3 km
Solar Photovoltaics · Operational
51.4 km
Solar Photovoltaics · Under Construction
0.51.6 km
Solar Photovoltaics · Operational
2.12.8 km
Solar Photovoltaics · Operational
10.43 km
Solar Photovoltaics · Operational
103.9 km
Solar Photovoltaics · Operational
49.94.7 km

How big is Eastfields Farm, Harbury - Battery Storage?

REPD does not record an installed capacity for Eastfields Farm, Harbury - Battery Storage.

Who operates Eastfields Farm, Harbury - Battery Storage?

REPD records the operator as Vantage RE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eastfields Farm, Harbury - Battery Storage approved and built?

The application was submitted on 29 July 2021. Permission was granted on 21 October 2021, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9701.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode