Titchfield Lane
Titchfield Lane is a 49 MW battery storage site under construction in Winchester. Planning permission was granted on 20 August 2020, 9 months after submission. Operator of record: Balanced Grid Solutions.
Planning and build timeline
| Application submitted | 4 December 2019 |
| Permission granted | 20 August 2020 9 months after submission |
| Operational | not recorded |
Screening a site of your own?
Winchester approves 89% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Titchfield Lane’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Winchester’s record on battery storage
Winchester has decided 9 battery storage schemes and approved 89%, taking a median of 5.1 months. See every battery storage scheme decision in Winchester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 1.04 | 2.7 km |
Solar Photovoltaics · Operational | 5.8 | 4 km |
Battery · Operational | 40 | 5.8 km |
Solar Photovoltaics · Operational | 20.5 | 5.9 km |
Solar Photovoltaics · Operational | 3 | 6.7 km |
Solar Photovoltaics · Operational | 12 | 6.8 km |
Solar Photovoltaics · Operational | 12 | 8.3 km |
Landfill Gas · Operational | 1.2 | 8.6 km |
How big is Titchfield Lane?
Titchfield Lane has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Titchfield Lane?
REPD records the operator as Balanced Grid Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Titchfield Lane approved and built?
The application was submitted on 4 December 2019. Permission was granted on 20 August 2020, 9 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7828.