Raglington Farm

Raglington Farm is operational in Winchester with a recorded capacity of 5.8 MW, and has been generating since 2013-08-31.

5.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-08-31
Solar Photovoltaics
Technology
NextEnery Solar Fund (NESF)
Winchester
Authority
England

Planning and build timeline

Application submitted2012-04-10
Permission granted2012-07-10
3 months after submission
Operational2013-08-31
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Winchester’s record on solar

Winchester has decided 24 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in Winchester

Other built sites within 15 km

SiteMWDistance
Bishop�s Waltham Solar Farm
Solar Photovoltaics · Operational
123.4 km
Forest Farm
Solar Photovoltaics · Operational
33.5 km
Titchfield Lane
Battery · Under Construction
494 km
Concorde Way, Segensworth - Solar Panels
Solar Photovoltaics · Under Construction
1.045.3 km
Fairoak Landfill
Landfill Gas · Operational
1.56.1 km
Chalcroft Solar Park
Solar Photovoltaics · Operational
6.36.4 km
Netley Landfill Solar
Solar Photovoltaics · Operational
127.7 km
Netley Landfill Site, Hampshire (Extension)
Landfill Gas · Operational
1.28 km

How big is Raglington Farm?

Raglington Farm has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Raglington Farm?

REPD records the operator as NextEnery Solar Fund (NESF). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Raglington Farm approved and built?

The application was submitted on 2012-04-10. Permission was granted on 2012-07-10, 3 months later. The site became operational on 2013-08-31, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1418.