Newlands Farm Battery Storage Facility Phase 2

Newlands Farm Battery Storage Facility Phase 2 is operational in Fareham with a recorded capacity of 40 MW, and has been generating since 2022-09-01.

40 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-09-01
Battery
Technology
British Solar Renewables
Fareham
Authority
England

Planning and build timeline

Application submitted2020-12-14
Permission granted2021-01-26
1 months after submission
Operational2022-09-01
19 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Newlands Farm Solar
Solar Photovoltaics · Operational
20.50.4 km
Titchfield Lane
Battery · Under Construction
495.8 km
Concorde Way, Segensworth - Solar Panels
Solar Photovoltaics · Under Construction
1.045.8 km
Paulsgrove Landfill Site
Landfill Gas · Operational
2.47 km
MMD Shipping Services
Solar Photovoltaics · Operational
1.27.6 km
Portsmouth International Port - Solar Panels
Solar Photovoltaics · Under Construction
1.27.6 km
Lakeside Business Park
Solar Photovoltaics · Under Construction
4.58.2 km
Lakeside Business Park
Battery · Under Construction
28.2 km

How big is Newlands Farm Battery Storage Facility Phase 2?

Newlands Farm Battery Storage Facility Phase 2 has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newlands Farm Battery Storage Facility Phase 2?

REPD records the operator as British Solar Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newlands Farm Battery Storage Facility Phase 2 approved and built?

The application was submitted on 2020-12-14. Permission was granted on 2021-01-26, 1 months later. The site became operational on 2022-09-01, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8264.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council