Bishop�s Waltham Solar Farm is an operational 12 MW solar farm in Winchester, generating since 17 February 2017. Planning permission was granted on 7 August 2015, 4 months after submission. Operator of record: Solafields U/Bishop's Waltham Renewables Ltd.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 17 February 2017
Solar Photovoltaics
Technology
Solafields U/Bishop's Waltham Renewables Ltd
Winchester
Authority
England

Planning and build timeline

Application submitted17 April 2015
Permission granted7 August 2015
4 months after submission
Operational17 February 2017
18 months after consent

Screening a site of your own?

RedlineUK · £39

Winchester approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bishop�s Waltham Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Winchester’s record on solar

Winchester has decided 24 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in Winchester

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
30.4 km
Solar Photovoltaics · Operational
5.83.4 km
Landfill Gas · Operational
1.55.6 km
Battery · Under Construction
496.8 km
Solar Photovoltaics · Operational
6.37 km
Solar Photovoltaics · Under Construction
1.048.6 km
Solar Photovoltaics · Operational
1210.6 km
Landfill Gas · Operational
1.211 km

How big is Bishop�s Waltham Solar Farm?

Bishop�s Waltham Solar Farm has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bishop�s Waltham Solar Farm?

REPD records the operator as Solafields U/Bishop's Waltham Renewables Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bishop�s Waltham Solar Farm approved and built?

The application was submitted on 17 April 2015. Permission was granted on 7 August 2015, 4 months later. The site became operational on 17 February 2017, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1325.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode