Netley Landfill Site, Hampshire (Extension) is operational in Eastleigh with a recorded capacity of 1.2 MW, and has been generating since 1997-06-18.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1997-06-18
Landfill Gas
Technology
Hampshire Waste Services/ ONYX / Power Plant Services
Eastleigh
Authority
England

Planning and build timeline

Application submitted1995-06-16
Permission granted1996-01-26
7 months after submission
Operational1997-06-18
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Netley Landfill Solar
Solar Photovoltaics · Operational
120.3 km
Fawley Waste to Energy Plant
EfW Incineration · Operational
8.65.4 km
Concorde Way, Segensworth - Solar Panels
Solar Photovoltaics · Under Construction
1.046.6 km
Chalcroft Solar Park
Solar Photovoltaics · Operational
6.37 km
Raglington Farm
Solar Photovoltaics · Operational
5.88 km
Marchwood ERF
EfW Incineration · Operational
168.4 km
Tavells Lane Solar Farm
Solar Photovoltaics · Operational
5.38.5 km
Titchfield Lane
Battery · Under Construction
498.6 km

How big is Netley Landfill Site, Hampshire (Extension)?

Netley Landfill Site, Hampshire (Extension) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Netley Landfill Site, Hampshire (Extension)?

REPD records the operator as Hampshire Waste Services/ ONYX / Power Plant Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Netley Landfill Site, Hampshire (Extension) approved and built?

The application was submitted on 1995-06-16. Permission was granted on 1996-01-26, 7 months later. The site became operational on 1997-06-18, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 800.