Novarly ParcelRenewable sites

Renewable sitesNewlands Farm Solar

Newlands Farm Solar

Newlands Farm Solar is operational in Fareham with a recorded capacity of 20.5 MW, and has been generating since 2014-03-29.

20.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-29
Solar Photovoltaics
Technology
Sunsave 10 (FAREHAM) / Vogt Solar
Fareham
Authority
England

Planning and build timeline

Application submitted2013-06-28
Permission granted2013-09-27
3 months after submission
Operational2014-03-29
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fareham’s record on solar

Fareham has decided 6 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Fareham

Other built sites within 15 km

SiteMWDistance
Newlands Farm Battery Storage Facility Phase 2
Battery · Operational
400.4 km
Concorde Way, Segensworth - Solar Panels
Solar Photovoltaics · Under Construction
1.045.8 km
Titchfield Lane
Battery · Under Construction
495.9 km
Paulsgrove Landfill Site
Landfill Gas · Operational
2.47.3 km
MMD Shipping Services
Solar Photovoltaics · Operational
1.27.8 km
Portsmouth International Port - Solar Panels
Solar Photovoltaics · Under Construction
1.27.9 km
Lakeside Business Park
Solar Photovoltaics · Under Construction
4.58.6 km
Lakeside Business Park
Battery · Under Construction
28.6 km

How big is Newlands Farm Solar?

Newlands Farm Solar has a recorded installed capacity of 20.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newlands Farm Solar?

REPD records the operator as Sunsave 10 (FAREHAM) / Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newlands Farm Solar approved and built?

The application was submitted on 2013-06-28. Permission was granted on 2013-09-27, 3 months later. The site became operational on 2014-03-29, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1362.