Renewable sites › Thornog Windfarm Extension
Thornog Windfarm Extension
Thornog Windfarm Extension is an operational 9.2 MW onshore wind farm in Fermanagh and Omagh, generating since 22 December 2014. Planning permission was granted on 11 September 2012, 41 months after submission. Operator of record: Energia Renewables.
Planning and build timeline
| Application submitted | 1 April 2009 |
| Permission granted | 11 September 2012 41 months after submission |
| Operational | 22 December 2014 27 months after consent |
Screening a site of your own?
Fermanagh and Omagh approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Thornog Windfarm Extension’s recorded coordinate — swap in your own postcode or coordinates.
Fermanagh and Omagh’s record on onshore wind
Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 9.2 | 0 km |
Wind Onshore · Operational | 25 | 3.3 km |
Wind Onshore · Operational | 6.9 | 3.3 km |
Wind Onshore · Operational | 10.5 | 4.3 km |
Wind Onshore · Operational | 30 | 4.3 km |
Wind Onshore · Operational | 9 | 4.9 km |
Wind Onshore · Under Construction | 27 | 7.4 km |
Wind Onshore · Operational | 38.4 | 8.8 km |
How big is Thornog Windfarm Extension?
Thornog Windfarm Extension has a recorded installed capacity of 9.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thornog Windfarm Extension?
REPD records the operator as Energia Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thornog Windfarm Extension approved and built?
The application was submitted on 1 April 2009. Permission was granted on 11 September 2012, 41 months later. The site became operational on 22 December 2014, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4081.