Renewable sites › Pigeon Top
Pigeon Top
Pigeon Top is a 27 MW onshore wind farm under construction in Fermanagh and Omagh. Planning permission was granted on 15 November 2012, 14 months after submission. Operator of record: Energia.
Planning and build timeline
| Application submitted | 26 September 2011 |
| Permission granted | 15 November 2012 14 months after submission |
| Operational | not recorded |
Screening a site of your own?
Fermanagh and Omagh approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pigeon Top’s recorded coordinate — swap in your own postcode or coordinates.
Fermanagh and Omagh’s record on onshore wind
Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 38.4 | 2.2 km |
Wind Onshore · Operational | 30 | 4.3 km |
Wind Onshore · Operational | 9.2 | 7.4 km |
Wind Onshore · Operational | 9.2 | 7.4 km |
Wind Onshore · Operational | 6.9 | 9.4 km |
Wind Onshore · Operational | 25 | 10.1 km |
Wind Onshore · Operational | 10.5 | 11.3 km |
Wind Onshore · Operational | 9 | 11.7 km |
How big is Pigeon Top?
Pigeon Top has a recorded installed capacity of 27 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pigeon Top?
REPD records the operator as Energia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pigeon Top approved and built?
The application was submitted on 26 September 2011. Permission was granted on 15 November 2012, 14 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4650.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode