Pollnalaght (Cornavarrow) is operational in Fermanagh and Omagh with a recorded capacity of 38.4 MW, and has been generating since 2018-06-15.

38.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-06-15
Wind Onshore
Technology
Energia
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted2006-06-23
Permission granted2009-10-16
40 months after submission
Operational2018-06-15
104 months after consent

Fermanagh and Omagh’s record on onshore wind

Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh

Other built sites within 15 km

SiteMWDistance
Pigeon Top
Wind Onshore · Under Construction
272.2 km
Curraghamulkin (Dooish Wind Farm)
Wind Onshore · Operational
304.8 km
Thornog Windfarm
Wind Onshore · Operational
9.28.8 km
Thornog Windfarm Extension
Wind Onshore · Operational
9.28.8 km
Slieveglass
Wind Onshore · Operational
6.911.2 km
Castlecraig
Wind Onshore · Operational
2511.7 km
Lough Hill
Wind Onshore · Operational
10.512.9 km
Bin Mountain
Wind Onshore · Operational
913.4 km

How big is Pollnalaght (Cornavarrow)?

Pollnalaght (Cornavarrow) has a recorded installed capacity of 38.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pollnalaght (Cornavarrow)?

REPD records the operator as Energia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pollnalaght (Cornavarrow) approved and built?

The application was submitted on 2006-06-23. Permission was granted on 2009-10-16, 40 months later. The site became operational on 2018-06-15, 104 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4107.