Curraghamulkin (Dooish Wind Farm) is an operational 30 MW onshore wind farm in Fermanagh and Omagh, generating since 15 July 2018. Planning permission was granted on 10 November 2017, 116 months after submission. Operator of record: DW Consultancy.

30 MW
Capacity
as recorded in REPD
Operational
Status
since 15 July 2018
Wind Onshore
Technology
DW Consultancy
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted12 March 2008
Permission granted10 November 2017
116 months after submission
Operational15 July 2018
8 months after consent

Screening a site of your own?

RedlineUK · £39

Fermanagh and Omagh approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Curraghamulkin (Dooish Wind Farm)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fermanagh and Omagh’s record on onshore wind

Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Under Construction
274.3 km
Wind Onshore · Operational
9.24.3 km
Wind Onshore · Operational
9.24.3 km
Wind Onshore · Operational
38.44.8 km
Wind Onshore · Operational
6.97.3 km
Wind Onshore · Operational
257.6 km
Wind Onshore · Operational
10.58.6 km
Wind Onshore · Operational
99.2 km

How big is Curraghamulkin (Dooish Wind Farm)?

Curraghamulkin (Dooish Wind Farm) has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Curraghamulkin (Dooish Wind Farm)?

REPD records the operator as DW Consultancy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Curraghamulkin (Dooish Wind Farm) approved and built?

The application was submitted on 12 March 2008. Permission was granted on 10 November 2017, 116 months later. The site became operational on 15 July 2018, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4151.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode