Renewable sites › BMW UK Manufacturing Ltd
BMW UK Manufacturing Ltd
BMW UK Manufacturing Ltd is operational in Oxford with a recorded capacity of 3 MW, and has been generating since 2014-11-05.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2014-11-05 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Oxford’s record on solar
Oxford has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Oxford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cowley electricity sub-station Battery · Operational | 49.9 | 1.8 km |
EFDA JJET Fusion Flywheel Flywheels · Operational | 400 | 8.7 km |
Wally Corner Landfill Site Solar Photovoltaics · Operational | 7 | 8.7 km |
Langley Hall Farm Solar Photovoltaics · Operational | 2.4 | 10.2 km |
The Flit Solar Photovoltaics · Operational | 10.5 | 10.5 km |
Easington Farm (Chalgrove) Solar Photovoltaics · Operational | 21.3 | 11.6 km |
Sutton Courtney Landfill Gas · Operational | 6 | 11.8 km |
Cassington AD (Waste AD) Anaerobic Digestion · Operational | 2.1 | 11.9 km |
How big is BMW UK Manufacturing Ltd?
BMW UK Manufacturing Ltd has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates BMW UK Manufacturing Ltd?
REPD records the operator as Free Green Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was BMW UK Manufacturing Ltd approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-11-05.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1284.