Renewable sitesBMW UK Manufacturing Ltd

BMW UK Manufacturing Ltd

BMW UK Manufacturing Ltd is an operational 3 MW solar farm in Oxford, generating since 5 November 2014. REPD does not record the planning grant date. Operator of record: Free Green Energy.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 5 November 2014
Solar Photovoltaics
Technology
Free Green Energy
Oxford
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational5 November 2014

Screening a site of your own?

RedlineUK · £39

Oxford approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with BMW UK Manufacturing Ltd’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Oxford’s record on solar

Oxford has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Oxford

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.91.8 km
Flywheels · Operational
4008.7 km
Solar Photovoltaics · Operational
78.7 km
Solar Photovoltaics · Operational
2.410.2 km
Solar Photovoltaics · Operational
10.510.5 km
Solar Photovoltaics · Operational
21.311.6 km
Landfill Gas · Operational
611.8 km
Anaerobic Digestion · Operational
2.111.9 km

How big is BMW UK Manufacturing Ltd?

BMW UK Manufacturing Ltd has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BMW UK Manufacturing Ltd?

REPD records the operator as Free Green Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BMW UK Manufacturing Ltd approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 5 November 2014.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1284.