Renewable sitesBMW UK Manufacturing Ltd

BMW UK Manufacturing Ltd

BMW UK Manufacturing Ltd is operational in Oxford with a recorded capacity of 3 MW, and has been generating since 2014-11-05.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-11-05
Solar Photovoltaics
Technology
Free Green Energy
Oxford
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2014-11-05

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Oxford’s record on solar

Oxford has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Oxford

Other built sites within 15 km

SiteMWDistance
Cowley electricity sub-station
Battery · Operational
49.91.8 km
EFDA JJET Fusion Flywheel
Flywheels · Operational
4008.7 km
Wally Corner Landfill Site
Solar Photovoltaics · Operational
78.7 km
Langley Hall Farm
Solar Photovoltaics · Operational
2.410.2 km
The Flit
Solar Photovoltaics · Operational
10.510.5 km
Easington Farm (Chalgrove)
Solar Photovoltaics · Operational
21.311.6 km
Sutton Courtney
Landfill Gas · Operational
611.8 km
Cassington AD (Waste AD)
Anaerobic Digestion · Operational
2.111.9 km

How big is BMW UK Manufacturing Ltd?

BMW UK Manufacturing Ltd has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BMW UK Manufacturing Ltd?

REPD records the operator as Free Green Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BMW UK Manufacturing Ltd approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-11-05.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1284.