Renewable sites › Easington Farm (Chalgrove)
Easington Farm (Chalgrove)
Easington Farm (Chalgrove) is operational in South Oxfordshire with a recorded capacity of 21.3 MW, and has been generating since 2015-03-17.
Planning and build timeline
| Application submitted | 2014-06-03 |
| Permission granted | 2014-08-14 2 months after submission |
| Operational | 2015-03-17 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Oxfordshire’s record on solar
South Oxfordshire has decided 22 solar farms and approved 95%, taking a median of 4.2 months. See every solar farm decision in South Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Langley Hall Farm Solar Photovoltaics · Operational | 2.4 | 2.8 km |
The Oxfordshire Golf Club Solar Photovoltaics · Operational | 0.3 | 7.1 km |
Wally Corner Landfill Site Solar Photovoltaics · Operational | 7 | 7.2 km |
Wallingford (Waste AD) Anaerobic Digestion · Operational | 2.4 | 7.3 km |
Crowmarsh Battle Farm (Farm AD) Anaerobic Digestion · Operational | 2.3 | 7.3 km |
Cowley electricity sub-station Battery · Operational | 49.9 | 10.2 km |
Winterbrook Solar Photovoltaics · Operational | 1.2 | 10.5 km |
BMW UK Manufacturing Ltd Solar Photovoltaics · Operational | 3 | 11.6 km |
How big is Easington Farm (Chalgrove)?
Easington Farm (Chalgrove) has a recorded installed capacity of 21.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Easington Farm (Chalgrove)?
REPD records the operator as Chalgrove Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Easington Farm (Chalgrove) approved and built?
The application was submitted on 2014-06-03. Permission was granted on 2014-08-14, 2 months later. The site became operational on 2015-03-17, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2333.
Novarly Parcel · official public data, read properly · parcel.novarly.com