Cowley electricity sub-station

Cowley electricity sub-station is operational in South Oxfordshire with a recorded capacity of 49.9 MW, and has been generating since 2021-06-22.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-06-22
Battery
Technology
Pivot Power
South Oxfordshire
Authority
England

Planning and build timeline

Application submitted2019-02-25
Permission granted2019-06-04
3 months after submission
Operational2021-06-22
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Oxfordshire’s record on battery storage

South Oxfordshire has decided 8 battery storage schemes and approved 75%, taking a median of 8.9 months. See every battery storage scheme decision in South Oxfordshire

Other built sites within 15 km

SiteMWDistance
BMW UK Manufacturing Ltd
Solar Photovoltaics · Operational
31.8 km
Wally Corner Landfill Site
Solar Photovoltaics · Operational
76.9 km
EFDA JJET Fusion Flywheel
Flywheels · Operational
4007.3 km
Langley Hall Farm
Solar Photovoltaics · Operational
2.48.6 km
Easington Farm (Chalgrove)
Solar Photovoltaics · Operational
21.310.2 km
Sutton Courtney
Landfill Gas · Operational
610.5 km
Sutton Courtenay Landfill Scheme
Landfill Gas · Operational
5.611.1 km
The Oxfordshire Golf Club
Solar Photovoltaics · Operational
0.311.9 km

How big is Cowley electricity sub-station?

Cowley electricity sub-station has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cowley electricity sub-station?

REPD records the operator as Pivot Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cowley electricity sub-station approved and built?

The application was submitted on 2019-02-25. Permission was granted on 2019-06-04, 3 months later. The site became operational on 2021-06-22, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7571.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council