Novarly ParcelRenewable sites

Renewable sitesThe Hazeley Academy

The Hazeley Academy

The Hazeley Academy is operational in Milton Keynes with a recorded capacity of 0.2 MW, and has been generating since 2019-10-16.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-10-16
Solar Photovoltaics
Technology
Solar Options for Schools
Milton Keynes
Authority
England

Planning and build timeline

Application submitted2019-02-22
Permission granted2020-05-27
15 months after submission
Operational2019-10-16

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on solar

Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Land At Potash Farm
Solar Photovoltaics · Operational
73.6 km
Stony Energy Storage Facility
Battery · Operational
79.93.9 km
Falcon Project
Battery · Operational
0.34.3 km
Milton Keynes Waste Recovery Park
Advanced Conversion Technologies · Operational
75.3 km
Bletchley Phase II
Landfill Gas · Operational
2.25.5 km
Mount Mill Farm
Solar Photovoltaics · Operational
126.1 km
Silver Spinney Farm
Battery · Under Construction
57.1 km
Land at Thornborough Grounds
Solar Photovoltaics · Operational
58 km

How big is The Hazeley Academy?

The Hazeley Academy has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates The Hazeley Academy?

REPD records the operator as Solar Options for Schools. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was The Hazeley Academy approved and built?

The application was submitted on 2019-02-22. Permission was granted on 2020-05-27, 15 months later. The site became operational on 2019-10-16.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7244.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council