The Hazeley Academy is an operational 0.2 MW solar farm in Milton Keynes, generating since 16 October 2019. Planning permission was granted on 27 May 2020, 15 months after submission. Operator of record: Solar Options for Schools.
Planning and build timeline
| Application submitted | 22 February 2019 |
| Permission granted | 27 May 2020 15 months after submission |
| Operational | 16 October 2019 |
Screening a site of your own?
Milton Keynes approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with The Hazeley Academy’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Milton Keynes’s record on solar
Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 7 | 3.6 km |
Battery · Operational | 79.9 | 3.9 km |
Battery · Operational | 0.3 | 4.3 km |
Advanced Conversion Technologies · Operational | 7 | 5.3 km |
Landfill Gas · Operational | 2.2 | 5.5 km |
Solar Photovoltaics · Operational | 12 | 6.1 km |
Battery · Under Construction | 5 | 7.1 km |
Solar Photovoltaics · Operational | 5 | 8 km |
How big is The Hazeley Academy?
The Hazeley Academy has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Hazeley Academy?
REPD records the operator as Solar Options for Schools. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Hazeley Academy approved and built?
The application was submitted on 22 February 2019. Permission was granted on 27 May 2020, 15 months later. The site became operational on 16 October 2019.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7244.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode