Bletchley Phase II

Bletchley Phase II is operational in Buckinghamshire with a recorded capacity of 2.2 MW, and has been generating since 2001-11-15.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-11-15
Landfill Gas
Technology
Waste Recycling Group
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted1996-06-04
Permission granted1996-07-10
1 months after submission
Operational2001-11-15
64 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Hazeley Academy
Solar Photovoltaics · Operational
0.25.5 km
Falcon Project
Battery · Operational
0.36.9 km
Land At Potash Farm
Solar Photovoltaics · Operational
78 km
Stony Energy Storage Facility
Battery · Operational
79.98.3 km
Blum Uk - Solar Panels
Solar Photovoltaics · Operational
8.6 km
Fox Covert Solar Farm
Battery · Operational
9.3 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
229.5 km
Double Arches Quarry Wind Turbine
Wind Onshore · Operational
1.59.5 km

How big is Bletchley Phase II?

Bletchley Phase II has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bletchley Phase II?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bletchley Phase II approved and built?

The application was submitted on 1996-06-04. Permission was granted on 1996-07-10, 1 months later. The site became operational on 2001-11-15, 64 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 536.