Stony Energy Storage Facility

Stony Energy Storage Facility is operational in Buckinghamshire with a recorded capacity of 79.9 MW, and has been generating since 2023-07-31.

79.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-07-31
Battery
Technology
Gore Street Energy Storage Fund
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2017-07-14
Permission granted2021-09-03
50 months after submission
Operational2023-07-31
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on battery storage

Buckinghamshire has decided 11 battery storage schemes and approved 82%, taking a median of 9 months. See every battery storage scheme decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Land At Potash Farm
Solar Photovoltaics · Operational
70.4 km
Mount Mill Farm
Solar Photovoltaics · Operational
122.9 km
The Hazeley Academy
Solar Photovoltaics · Operational
0.23.9 km
Silver Spinney Farm
Battery · Under Construction
54.1 km
Land at Thornborough Grounds
Solar Photovoltaics · Operational
54.2 km
Fox Covert Solar Farm
Battery · Operational
6.5 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
226.6 km
Milton Keynes Waste Recovery Park
Advanced Conversion Technologies · Operational
76.6 km

How big is Stony Energy Storage Facility?

Stony Energy Storage Facility has a recorded installed capacity of 79.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stony Energy Storage Facility?

REPD records the operator as Gore Street Energy Storage Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stony Energy Storage Facility approved and built?

The application was submitted on 2017-07-14. Permission was granted on 2021-09-03, 50 months later. The site became operational on 2023-07-31, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7001.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council