Renewable sitesMilton Keynes Waste Recovery Park

Milton Keynes Waste Recovery Park

Milton Keynes Waste Recovery Park is operational in Milton Keynes with a recorded capacity of 7 MW, and has been generating since 2018-03-01.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-03-01
Advanced Conversion Technologies
Technology
AmeyCespa
Milton Keynes
Authority
England

Planning and build timeline

Application submitted2013-04-26
Permission granted2013-07-12
3 months after submission
Operational2018-03-01
56 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Falcon Project
Battery · Operational
0.34.8 km
The Hazeley Academy
Solar Photovoltaics · Operational
0.25.3 km
The Kickles
Solar Photovoltaics · Operational
55.9 km
Mount Mill Farm
Solar Photovoltaics · Operational
126.3 km
Silver Spinney Farm
Battery · Under Construction
56.5 km
Land At Potash Farm
Solar Photovoltaics · Operational
76.6 km
Stony Energy Storage Facility
Battery · Operational
79.96.6 km
Littlewood Farm
Solar Photovoltaics · Operational
146.7 km

How big is Milton Keynes Waste Recovery Park?

Milton Keynes Waste Recovery Park has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Milton Keynes Waste Recovery Park?

REPD records the operator as AmeyCespa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Milton Keynes Waste Recovery Park approved and built?

The application was submitted on 2013-04-26. Permission was granted on 2013-07-12, 3 months later. The site became operational on 2018-03-01, 56 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 975.