Renewable sitesLand at Thornborough Grounds

Land at Thornborough Grounds

Land at Thornborough Grounds is an operational 5 MW solar farm in Buckinghamshire, generating since 31 March 2016. Planning permission was granted on 10 June 2015, 3 months after submission. Operator of record: NESF (formerly Lark Energy).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2016
Solar Photovoltaics
Technology
NESF (formerly Lark Energy)
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted11 March 2015
Permission granted10 June 2015
3 months after submission
Operational31 March 2016
10 months after consent

Screening a site of your own?

RedlineUK · £39

Buckinghamshire approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Thornborough Grounds’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
124.2 km
Battery · Operational
79.94.2 km
Solar Photovoltaics · Operational
0.24.3 km
Solar Photovoltaics · Operational
74.4 km
Battery · Under Construction
54.8 km
Solar Photovoltaics · Operational
225.4 km
Battery · Operational
5.4 km
Solar Photovoltaics · Operational
9.25.8 km

How big is Land at Thornborough Grounds?

Land at Thornborough Grounds has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Thornborough Grounds?

REPD records the operator as NESF (formerly Lark Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Thornborough Grounds approved and built?

The application was submitted on 11 March 2015. Permission was granted on 10 June 2015, 3 months later. The site became operational on 31 March 2016, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5092.