Land at Thornborough Grounds is operational in Buckinghamshire with a recorded capacity of 5 MW, and has been generating since 2016-03-31.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-31
Solar Photovoltaics
Technology
NESF (formerly Lark Energy)
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2015-03-11
Permission granted2015-06-10
3 months after submission
Operational2016-03-31
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Mount Mill Farm
Solar Photovoltaics · Operational
124.2 km
Stony Energy Storage Facility
Battery · Operational
79.94.2 km
Buckingham Tesco Superstore
Solar Photovoltaics · Operational
0.24.3 km
Land At Potash Farm
Solar Photovoltaics · Operational
74.4 km
Silver Spinney Farm
Battery · Under Construction
54.8 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
225.4 km
Fox Covert Solar Farm
Battery · Operational
5.4 km
Gawcott Fields Farm
Solar Photovoltaics · Operational
9.25.8 km

How big is Land at Thornborough Grounds?

Land at Thornborough Grounds has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Thornborough Grounds?

REPD records the operator as NESF (formerly Lark Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Thornborough Grounds approved and built?

The application was submitted on 2015-03-11. Permission was granted on 2015-06-10, 3 months later. The site became operational on 2016-03-31, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5092.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council