Novarly ParcelRenewable sites

Renewable sitesSilver Spinney Farm

Silver Spinney Farm

Silver Spinney Farm is a 5 MW battery storage site under construction in West Northamptonshire. REPD does not record the planning grant date. Operator of record: Thrive Renewables.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Thrive Renewables
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted14 January 2019
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

West Northamptonshire approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Silver Spinney Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on battery storage

West Northamptonshire has decided 8 battery storage schemes and approved 100%, taking a median of 2.6 months. See every battery storage scheme decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
121.2 km
Battery · Operational
79.94.1 km
Solar Photovoltaics · Operational
74.5 km
Solar Photovoltaics · Operational
54.8 km
Solar Photovoltaics · Operational
17.66.2 km
Advanced Conversion Technologies · Operational
76.5 km
Solar Photovoltaics · Operational
0.27.1 km
Solar Photovoltaics · Operational
0.28.4 km

How big is Silver Spinney Farm?

Silver Spinney Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Silver Spinney Farm?

REPD records the operator as Thrive Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Silver Spinney Farm approved and built?

The application was submitted on 14 January 2019. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7307.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode