Novarly ParcelRenewable sites

Renewable sitesLand At Potash Farm

Land At Potash Farm

Land At Potash Farm is operational in Buckinghamshire with a recorded capacity of 7 MW, and has been generating since 2013-03-30.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-30
Solar Photovoltaics
Technology
PS Renewables
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2011-02-07
Permission granted2011-04-20
2 months after submission
Operational2013-03-30
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Stony Energy Storage Facility
Battery · Operational
79.90.4 km
Mount Mill Farm
Solar Photovoltaics · Operational
123.3 km
The Hazeley Academy
Solar Photovoltaics · Operational
0.23.6 km
Land at Thornborough Grounds
Solar Photovoltaics · Operational
54.4 km
Silver Spinney Farm
Battery · Under Construction
54.5 km
Fox Covert Solar Farm
Battery · Operational
6.4 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
226.5 km
Milton Keynes Waste Recovery Park
Advanced Conversion Technologies · Operational
76.6 km

How big is Land At Potash Farm?

Land At Potash Farm has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Potash Farm?

REPD records the operator as PS Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Potash Farm approved and built?

The application was submitted on 2011-02-07. Permission was granted on 2011-04-20, 2 months later. The site became operational on 2013-03-30, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1184.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council