Falcon Project is operational in Milton Keynes with a recorded capacity of 0.3 MW, and has been generating since 2013-12-11.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-12-11
Battery
Technology
Western Power Distribution
Milton Keynes
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2013-12-11

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on battery storage

Milton Keynes has decided 28 battery storage schemes and approved 82%, taking a median of 1.8 months. See every battery storage scheme decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
The Hazeley Academy
Solar Photovoltaics · Operational
0.24.3 km
Caldecote Farm - Storage & Distribution Unit
Solar Photovoltaics · Under Construction
0.264.6 km
Milton Keynes Waste Recovery Park
Advanced Conversion Technologies · Operational
74.8 km
Blum Uk - Solar Panels
Solar Photovoltaics · Operational
4.8 km
The Kickles
Solar Photovoltaics · Operational
56.3 km
Bletchley Phase II
Landfill Gas · Operational
2.26.9 km
Harvie Card Way - Solar panels
Solar Photovoltaics · Operational
1.977.1 km
Land At Potash Farm
Solar Photovoltaics · Operational
77.7 km

How big is Falcon Project?

Falcon Project has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Falcon Project?

REPD records the operator as Western Power Distribution. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Falcon Project approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2013-12-11.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6864.

Novarly Parcel · official public data, read properly · parcel.novarly.com