Novarly ParcelRenewable sites

Renewable sitesFalcon Project

Falcon Project

Falcon Project is an operational 0.3 MW battery storage site in Milton Keynes, generating since 11 December 2013. REPD does not record the planning grant date. Operator of record: Western Power Distribution.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 11 December 2013
Battery
Technology
Western Power Distribution
Milton Keynes
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational11 December 2013

Screening a site of your own?

RedlineUK · £39

Milton Keynes approves 82% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Falcon Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on battery storage

Milton Keynes has decided 28 battery storage schemes and approved 82%, taking a median of 1.8 months. See every battery storage scheme decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.24.3 km
Solar Photovoltaics · Under Construction
0.264.6 km
Advanced Conversion Technologies · Operational
74.8 km
Solar Photovoltaics · Operational
4.8 km
Solar Photovoltaics · Operational
56.3 km
Landfill Gas · Operational
2.26.9 km
Solar Photovoltaics · Operational
1.977.1 km
Solar Photovoltaics · Operational
77.7 km

How big is Falcon Project?

Falcon Project has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Falcon Project?

REPD records the operator as Western Power Distribution. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Falcon Project approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 11 December 2013.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6864.