Eastfields Farm, Deppers Bridge - Solar Farm
Eastfields Farm, Deppers Bridge - Solar Farm is a 34.8 MW solar farm under construction in Stratford-on-Avon. Planning permission was granted on 26 August 2021, 1 months after submission. Operator of record: Vantage RE.
Planning and build timeline
| Application submitted | 29 July 2021 |
| Permission granted | 26 August 2021 1 months after submission |
| Operational | not recorded |
Screening a site of your own?
Stratford-on-Avon approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Eastfields Farm, Deppers Bridge - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stratford-on-Avon’s record on solar
Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | — | 0.4 km |
Solar Photovoltaics · Operational | 5 | 1.4 km |
Landfill Gas · Operational | 1 | 1.7 km |
Solar Photovoltaics · Under Construction | 0.5 | 1.8 km |
Solar Photovoltaics · Operational | 2.1 | 2.5 km |
Solar Photovoltaics · Operational | 10.4 | 2.8 km |
Solar Photovoltaics · Operational | 10 | 4.2 km |
Solar Photovoltaics · Operational | 49.9 | 4.4 km |
How big is Eastfields Farm, Deppers Bridge - Solar Farm?
Eastfields Farm, Deppers Bridge - Solar Farm has a recorded installed capacity of 34.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eastfields Farm, Deppers Bridge - Solar Farm?
REPD records the operator as Vantage RE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eastfields Farm, Deppers Bridge - Solar Farm approved and built?
The application was submitted on 29 July 2021. Permission was granted on 26 August 2021, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9173.