Feldon Vale Solar Farm is operational in Stratford-on-Avon with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
Low Carbon
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted2022-09-09
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on solar

Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
The Elms
Solar Photovoltaics · Operational
10.42.1 km
Weddington Farm
Solar Photovoltaics · Operational
2.12.7 km
Banbury Road, Gaydon - Solar Array
Solar Photovoltaics · Operational
183.7 km
Eastfields Farm, Deppers Bridge - Solar Farm
Solar Photovoltaics · Under Construction
34.84.4 km
Eastfields Farm, Harbury - Battery Storage
Battery · Under Construction
4.7 km
Solar Farm at Fields Farm (Phase 1)
Solar Photovoltaics · Operational
55.5 km
Ufton
Landfill Gas · Operational
15.7 km
Lower Farm
Solar Photovoltaics · Under Construction
0.56.2 km

How big is Feldon Vale Solar Farm?

Feldon Vale Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Feldon Vale Solar Farm?

REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Feldon Vale Solar Farm approved and built?

The application was submitted on 2022-09-09. REPD does not record a grant date. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12137.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council