Renewable sites › Feldon Vale Solar Farm
Feldon Vale Solar Farm
Feldon Vale Solar Farm is an operational 49.9 MW solar farm in Stratford-on-Avon. REPD does not record the planning grant date. Operator of record: Low Carbon.
Planning and build timeline
| Application submitted | 9 September 2022 |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Stratford-on-Avon approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Feldon Vale Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stratford-on-Avon’s record on solar
Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 10.4 | 2.1 km |
Solar Photovoltaics · Operational | 2.1 | 2.7 km |
Solar Photovoltaics · Operational | 18 | 3.7 km |
Solar Photovoltaics · Under Construction | 34.8 | 4.4 km |
Battery · Under Construction | — | 4.7 km |
Solar Photovoltaics · Operational | 5 | 5.5 km |
Landfill Gas · Operational | 1 | 5.7 km |
Solar Photovoltaics · Under Construction | 0.5 | 6.2 km |
How big is Feldon Vale Solar Farm?
Feldon Vale Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Feldon Vale Solar Farm?
REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Feldon Vale Solar Farm approved and built?
The application was submitted on 9 September 2022. REPD does not record a grant date. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12137.