Tesco Wombwell Lane

Tesco Wombwell Lane is operational in Barnsley with a recorded capacity of 0.2 MW, and has been generating since 2020-04-01.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-04-01
Solar Photovoltaics
Technology
Batchelor Electrical
Barnsley
Authority
England

Planning and build timeline

Application submitted2019-03-12
Permission granted2019-07-09
4 months after submission
Operational2020-04-01
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on solar

Barnsley has decided 13 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Barnsley Battery Energy Storage
Battery · Operational
401.4 km
Stairfoot Battery Storage Facility
Battery · Operational
1.6 km
Park Spring Wind Farm
Wind Onshore · Operational
8.64.3 km
Premier Foods Bakery, Fish Dam Lane - Solar Farm
Solar Photovoltaics · Operational
25.1 km
Barnsley 1.5
Biomass (dedicated) · Operational
96.3 km
Goldthorpe
Solar Photovoltaics · Operational
1.57.8 km
Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)
Anaerobic Digestion · Operational
48.5 km
South Kirkby Business Park (Waste AD)
Anaerobic Digestion · Operational
69.3 km

How big is Tesco Wombwell Lane?

Tesco Wombwell Lane has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tesco Wombwell Lane?

REPD records the operator as Batchelor Electrical. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tesco Wombwell Lane approved and built?

The application was submitted on 2019-03-12. Permission was granted on 2019-07-09, 4 months later. The site became operational on 2020-04-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7225.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council