Novarly ParcelRenewable sites

Renewable sitesSouth Kirkby Business Park (Waste AD)

South Kirkby Business Park (Waste AD)

South Kirkby Business Park (Waste AD) is an operational 6 MW anaerobic digestion plant in Wakefield, generating since 1 December 2015. Planning permission was granted on 27 November 2008, 5 months after submission. Operator of record: Shanks Group.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2015
Anaerobic Digestion
Technology
Shanks Group
Wakefield
Authority
England

Planning and build timeline

Application submitted19 June 2008
Permission granted27 November 2008
5 months after submission
Operational1 December 2015
84 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Wakefield: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with South Kirkby Business Park (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
34.4 km
Solar Photovoltaics · Operational
2.44.6 km
Wind Onshore · Operational
8.65.2 km
Wind Onshore · Operational
86.4 km
Solar Photovoltaics · Operational
26.8 km
Landfill Gas · Operational
2.17.3 km
Solar Photovoltaics · Operational
1.58.3 km
Battery · Operational
9.2 km

How big is South Kirkby Business Park (Waste AD)?

South Kirkby Business Park (Waste AD) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South Kirkby Business Park (Waste AD)?

REPD records the operator as Shanks Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South Kirkby Business Park (Waste AD) approved and built?

The application was submitted on 19 June 2008. Permission was granted on 27 November 2008, 5 months later. The site became operational on 1 December 2015, 84 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 289.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode