South Kirkby Business Park (Waste AD) is operational in Wakefield with a recorded capacity of 6 MW, and has been generating since 2015-12-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-01
Anaerobic Digestion
Technology
Shanks Group
Wakefield
Authority
England

Planning and build timeline

Application submitted2008-06-19
Permission granted2008-11-27
5 months after submission
Operational2015-12-01
84 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Elmsall Way, South Elmsall - Solar Panels
Solar Photovoltaics · Under Construction
34.4 km
Elmsall Way Warehouse
Solar Photovoltaics · Operational
2.44.6 km
Park Spring Wind Farm
Wind Onshore · Operational
8.65.2 km
Hampole Wind Farm
Wind Onshore · Operational
86.4 km
Premier Foods Bakery, Fish Dam Lane - Solar Farm
Solar Photovoltaics · Operational
26.8 km
Skelbrooke Landfill Gas Project
Landfill Gas · Operational
2.17.3 km
Goldthorpe
Solar Photovoltaics · Operational
1.58.3 km
Stairfoot Battery Storage Facility
Battery · Operational
9.2 km

How big is South Kirkby Business Park (Waste AD)?

South Kirkby Business Park (Waste AD) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South Kirkby Business Park (Waste AD)?

REPD records the operator as Shanks Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South Kirkby Business Park (Waste AD) approved and built?

The application was submitted on 2008-06-19. Permission was granted on 2008-11-27, 5 months later. The site became operational on 2015-12-01, 84 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 289.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council