Novarly ParcelRenewable sites

Renewable sitesPremier Foods Bakery, Fish Dam Lane - Solar Farm

Premier Foods Bakery, Fish Dam Lane - Solar Farm

Premier Foods Bakery, Fish Dam Lane - Solar Farm is operational in Barnsley with a recorded capacity of 2 MW, and has been generating since 2025-12-01.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-12-01
Solar Photovoltaics
Technology
Premier Foods Plc
Barnsley
Authority
England

Planning and build timeline

Application submitted2023-09-11
Permission granted2024-04-08
7 months after submission
Operational2025-12-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on solar

Barnsley has decided 13 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Park Spring Wind Farm
Wind Onshore · Operational
8.62.8 km
Stairfoot Battery Storage Facility
Battery · Operational
3.9 km
Barnsley Battery Energy Storage
Battery · Operational
404.1 km
Tesco Wombwell Lane
Solar Photovoltaics · Operational
0.25.1 km
Barnsley 1.5
Biomass (dedicated) · Operational
95.3 km
South Kirkby Business Park (Waste AD)
Anaerobic Digestion · Operational
66.8 km
Goldthorpe
Solar Photovoltaics · Operational
1.510.2 km
Elmsall Way, South Elmsall - Solar Panels
Solar Photovoltaics · Under Construction
311 km

How big is Premier Foods Bakery, Fish Dam Lane - Solar Farm?

Premier Foods Bakery, Fish Dam Lane - Solar Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Premier Foods Bakery, Fish Dam Lane - Solar Farm?

REPD records the operator as Premier Foods Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Premier Foods Bakery, Fish Dam Lane - Solar Farm approved and built?

The application was submitted on 2023-09-11. Permission was granted on 2024-04-08, 7 months later. The site became operational on 2025-12-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16367.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council