Novarly ParcelRenewable sites

Renewable sitesBarnsley Battery Energy Storage

Barnsley Battery Energy Storage

Barnsley Battery Energy Storage is an operational 40 MW battery storage site in Barnsley, generating since 1 January 2023. Planning permission was granted on 2 August 2017, 6 months after submission. Operator of record: G2 Energy / SMS Energy Services Ltd.

40 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2023
Battery
Technology
G2 Energy / SMS Energy Services Ltd
Barnsley
Authority
England

Planning and build timeline

Application submitted26 January 2017
Permission granted2 August 2017
6 months after submission
Operational1 January 2023
65 months after consent

Screening a site of your own?

RedlineUK · £39

Barnsley approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Barnsley Battery Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on battery storage

Barnsley has decided 5 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0.2 km
Solar Photovoltaics · Operational
0.21.4 km
Solar Photovoltaics · Operational
24.1 km
Wind Onshore · Operational
8.64.2 km
Biomass (dedicated) · Operational
94.9 km
Solar Photovoltaics · Operational
1.59 km
Anaerobic Digestion · Operational
69.3 km
Anaerobic Digestion · Operational
49.9 km

How big is Barnsley Battery Energy Storage?

Barnsley Battery Energy Storage has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barnsley Battery Energy Storage?

REPD records the operator as G2 Energy / SMS Energy Services Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barnsley Battery Energy Storage approved and built?

The application was submitted on 26 January 2017. Permission was granted on 2 August 2017, 6 months later. The site became operational on 1 January 2023, 65 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20397.