Renewable sites › Stairfoot Battery Storage Facility
Stairfoot Battery Storage Facility
Stairfoot Battery Storage Facility is an operational battery storage site in Barnsley, generating since 31 July 2021. Planning permission was granted on 8 November 2022, 22 months after submission. Operator of record: Noriker Power Limited.
Planning and build timeline
| Application submitted | 4 January 2021 |
| Permission granted | 8 November 2022 22 months after submission |
| Operational | 31 July 2021 |
Screening a site of your own?
Barnsley approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stairfoot Battery Storage Facility’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Barnsley’s record on battery storage
Barnsley has decided 5 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Barnsley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | 40 | 0.2 km |
Solar Photovoltaics · Operational | 0.2 | 1.6 km |
Solar Photovoltaics · Operational | 2 | 3.9 km |
Wind Onshore · Operational | 8.6 | 4.1 km |
Biomass (dedicated) · Operational | 9 | 4.8 km |
Solar Photovoltaics · Operational | 1.5 | 9.1 km |
Anaerobic Digestion · Operational | 6 | 9.2 km |
Anaerobic Digestion · Operational | 4 | 10 km |
How big is Stairfoot Battery Storage Facility?
REPD does not record an installed capacity for Stairfoot Battery Storage Facility.
Who operates Stairfoot Battery Storage Facility?
REPD records the operator as Noriker Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stairfoot Battery Storage Facility approved and built?
The application was submitted on 4 January 2021. Permission was granted on 8 November 2022, 22 months later. The site became operational on 31 July 2021.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8392.