Renewable sitesStairfoot Battery Storage Facility

Stairfoot Battery Storage Facility

Stairfoot Battery Storage Facility is an operational battery storage site in Barnsley, generating since 31 July 2021. Planning permission was granted on 8 November 2022, 22 months after submission. Operator of record: Noriker Power Limited.

Capacity
as recorded in REPD
Operational
Status
since 31 July 2021
Battery
Technology
Noriker Power Limited
Barnsley
Authority
England

Planning and build timeline

Application submitted4 January 2021
Permission granted8 November 2022
22 months after submission
Operational31 July 2021

Screening a site of your own?

RedlineUK · £39

Barnsley approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stairfoot Battery Storage Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on battery storage

Barnsley has decided 5 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Battery · Operational
400.2 km
Solar Photovoltaics · Operational
0.21.6 km
Solar Photovoltaics · Operational
23.9 km
Wind Onshore · Operational
8.64.1 km
Biomass (dedicated) · Operational
94.8 km
Solar Photovoltaics · Operational
1.59.1 km
Anaerobic Digestion · Operational
69.2 km
Anaerobic Digestion · Operational
410 km

How big is Stairfoot Battery Storage Facility?

REPD does not record an installed capacity for Stairfoot Battery Storage Facility.

Who operates Stairfoot Battery Storage Facility?

REPD records the operator as Noriker Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stairfoot Battery Storage Facility approved and built?

The application was submitted on 4 January 2021. Permission was granted on 8 November 2022, 22 months later. The site became operational on 31 July 2021.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8392.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode