Renewable sites › Farnborough Airport - Solar Panels
Farnborough Airport - Solar Panels
Farnborough Airport - Solar Panels is operational in Rushmoor with a recorded capacity of 1.7 MW, and has been generating since 2024-11-12.
Planning and build timeline
| Application submitted | 2023-08-23 |
| Permission granted | 2023-10-04 1 months after submission |
| Operational | 2024-11-12 13 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rushmoor’s record on solar
Rushmoor has decided 5 solar farms and approved 100%, taking a median of 1.5 months. See every solar farm decision in Rushmoor →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Farnborough International Exhibition Centre, Etps Road - Solar Panels Solar Photovoltaics · Under Construction | 1.15 | 1.4 km |
Hungerford Farm Solar Photovoltaics · Operational | 5 | 7.3 km |
Runfold Landfill Landfill Gas · Operational | 1.2 | 7.3 km |
Taplins Farm solar park Solar Photovoltaics · Operational | 5.9 | 7.5 km |
Marsh House Solar Park Solar Photovoltaics · Operational | 5.5 | 10 km |
Farnham Landfill Landfill Gas · Operational | 2.4 | 10.4 km |
Bunkers Hill Farm - Solar farm & Battery stations Solar Photovoltaics · Under Construction | 49.9 | 12.7 km |
Bunkers Hill Farm - Solar farm & Battery stations Battery · Under Construction | — | 12.7 km |
How big is Farnborough Airport - Solar Panels?
Farnborough Airport - Solar Panels has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Farnborough Airport - Solar Panels?
REPD records the operator as Farnborough Airport Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Farnborough Airport - Solar Panels approved and built?
The application was submitted on 2023-08-23. Permission was granted on 2023-10-04, 1 months later. The site became operational on 2024-11-12, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14754.