Renewable sites › Farnborough International Exhibition Centre, Etps Road - Solar Panels
Farnborough International Exhibition Centre, Etps Road - Solar Panels
Farnborough International Exhibition Centre, Etps Road - Solar Panels is under construction in Rushmoor with a recorded capacity of 1.15 MW.
Planning and build timeline
| Application submitted | 2023-12-20 |
| Permission granted | 2024-02-15 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rushmoor’s record on solar
Rushmoor has decided 5 solar farms and approved 100%, taking a median of 1.5 months. See every solar farm decision in Rushmoor →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Farnborough Airport - Solar Panels Solar Photovoltaics · Operational | 1.7 | 1.4 km |
Runfold Landfill Landfill Gas · Operational | 1.2 | 6.6 km |
Hungerford Farm Solar Photovoltaics · Operational | 5 | 8.5 km |
Taplins Farm solar park Solar Photovoltaics · Operational | 5.9 | 8.8 km |
Marsh House Solar Park Solar Photovoltaics · Operational | 5.5 | 10.2 km |
Farnham Landfill Landfill Gas · Operational | 2.4 | 10.4 km |
Royal Surrey County Hospital - Solar Panels Solar Photovoltaics · Under Construction | — | 11.3 km |
Bunkers Hill Farm - Solar farm & Battery stations Battery · Under Construction | — | 14 km |
How big is Farnborough International Exhibition Centre, Etps Road - Solar Panels?
Farnborough International Exhibition Centre, Etps Road - Solar Panels has a recorded installed capacity of 1.15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Farnborough International Exhibition Centre, Etps Road - Solar Panels?
REPD records the operator as Farnborough International Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Farnborough International Exhibition Centre, Etps Road - Solar Panels approved and built?
The application was submitted on 2023-12-20. Permission was granted on 2024-02-15, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15581.
Novarly Parcel · official public data, read properly · parcel.novarly.com