Novarly ParcelRenewable sites

Renewable sitesBasingstoke Sewage Treatment Works

Basingstoke Sewage Treatment Works

Basingstoke Sewage Treatment Works is operational in Basingstoke and Deane with a recorded capacity of 1.2 MW, and has been generating since 2017-02-16.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-16
Anaerobic Digestion
Technology
Thames Water Utilities
Basingstoke and Deane
Authority
England

Planning and build timeline

Application submitted2015-09-29
Permission granted2015-12-21
3 months after submission
Operational2017-02-16
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Chineham ERF
EfW Incineration · Operational
80.2 km
Minchens Lane Battery Storage Facility
Battery · Operational
1005 km
Bunkers Hill Farm - Solar farm & Battery stations
Battery · Under Construction
5.5 km
Bunkers Hill Farm - Solar farm & Battery stations
Solar Photovoltaics · Under Construction
49.95.5 km
Hill End Farm
Solar Photovoltaics · Operational
2.85.8 km
Kiln Fields Solar Farm
Solar Photovoltaics · Under Construction
17.876.4 km
Berry Court Solar Farm - energy storage
Battery · Operational
16.5 km
Berry Court Farm
Solar Photovoltaics · Operational
4.26.8 km

How big is Basingstoke Sewage Treatment Works?

Basingstoke Sewage Treatment Works has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Basingstoke Sewage Treatment Works?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Basingstoke Sewage Treatment Works approved and built?

The application was submitted on 2015-09-29. Permission was granted on 2015-12-21, 3 months later. The site became operational on 2017-02-16, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6054.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council