Renewable sitesSyston Road - Solar Farm

Syston Road - Solar Farm

Syston Road - Solar Farm is under construction in Charnwood with a recorded capacity of 26 MW.

26 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Barber Farm Partnership
Charnwood
Authority
England

Planning and build timeline

Application submitted2022-02-08
Permission granted2022-08-12
6 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Charnwood’s record on solar

Charnwood has decided 18 solar farms and approved 94%, taking a median of 5.5 months. See every solar farm decision in Charnwood

Other built sites within 15 km

SiteMWDistance
Severn Trent STW
Wind Onshore · Operational
2.52 km
Apac Packaging, Loughborough Road - Solar Panels
Solar Photovoltaics · Under Construction
0.92.5 km
Gypsom Solar Farm
Solar Photovoltaics · Operational
53.5 km
Mountsorrel Landfill Site
Landfill Gas · Operational
1.64.6 km
Hoods Close - Solar Panels
Solar Photovoltaics · Under Construction
1.75.5 km
Pepsico International Limited, Leycroft Road - Solar Panels
Solar Photovoltaics · Under Construction
3.256.2 km
National Space Centre
Solar Photovoltaics · Operational
0.26.8 km
Six Hills Solar Farm
Solar Photovoltaics · Operational
18.79.1 km

How big is Syston Road - Solar Farm?

Syston Road - Solar Farm has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Syston Road - Solar Farm?

REPD records the operator as Barber Farm Partnership. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Syston Road - Solar Farm approved and built?

The application was submitted on 2022-02-08. Permission was granted on 2022-08-12, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8336.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council