Renewable sites › Mountsorrel Landfill Site
Mountsorrel Landfill Site
Mountsorrel Landfill Site is operational in Charnwood with a recorded capacity of 1.6 MW, and has been generating since 1996-05-01.
Planning and build timeline
| Application submitted | 1994-06-07 |
| Permission granted | 1994-10-24 5 months after submission |
| Operational | 1996-05-01 18 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Apac Packaging, Loughborough Road - Solar Panels Solar Photovoltaics · Under Construction | 0.9 | 2.1 km |
Gypsom Solar Farm Solar Photovoltaics · Operational | 5 | 2.9 km |
Severn Trent STW Wind Onshore · Operational | 2.5 | 4.4 km |
Syston Road - Solar Farm Solar Photovoltaics · Under Construction | 26 | 4.6 km |
Hoods Close - Solar Panels Solar Photovoltaics · Under Construction | 1.7 | 6.4 km |
Pepsico International Limited, Leycroft Road - Solar Panels Solar Photovoltaics · Under Construction | 3.25 | 6.8 km |
National Space Centre Solar Photovoltaics · Operational | 0.2 | 8.6 km |
Bradgate Quarry Landfill Gas Scheme Landfill Gas · Operational | 2.5 | 8.6 km |
How big is Mountsorrel Landfill Site?
Mountsorrel Landfill Site has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mountsorrel Landfill Site?
REPD records the operator as Redland Aggregates Ltd / Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mountsorrel Landfill Site approved and built?
The application was submitted on 1994-06-07. Permission was granted on 1994-10-24, 5 months later. The site became operational on 1996-05-01, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 749.