Novarly ParcelRenewable sites

Renewable sitesHoods Close - Solar Panels

Hoods Close - Solar Panels

Hoods Close - Solar Panels is under construction in Leicester with a recorded capacity of 1.7 MW.

1.7 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Trelleborg Industrial AVS
Leicester
Authority
England

Planning and build timeline

Application submitted2023-04-06
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Leicester’s record on solar

Leicester has decided 13 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Leicester

Other built sites within 15 km

SiteMWDistance
Pepsico International Limited, Leycroft Road - Solar Panels
Solar Photovoltaics · Under Construction
3.250.9 km
National Space Centre
Solar Photovoltaics · Operational
0.22.3 km
Severn Trent STW
Wind Onshore · Operational
2.53.5 km
Newarke St Car Park - Solar Panels
Solar Photovoltaics · Under Construction
4.7 km
Syston Road - Solar Farm
Solar Photovoltaics · Under Construction
265.5 km
Apac Packaging, Loughborough Road - Solar Panels
Solar Photovoltaics · Under Construction
0.95.5 km
Kirby Road Solar Panels
Solar Photovoltaics · Under Construction
0.495.5 km
Mountsorrel Landfill Site
Landfill Gas · Operational
1.66.4 km

How big is Hoods Close - Solar Panels?

Hoods Close - Solar Panels has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hoods Close - Solar Panels?

REPD records the operator as Trelleborg Industrial AVS. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hoods Close - Solar Panels approved and built?

The application was submitted on 2023-04-06. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13697.

Novarly Parcel · official public data, read properly · parcel.novarly.com